[Construction Example] Multi Drill SR-45 (Equivalent to BG) Low Headroom Size
Introduction to the case of underground obstacle removal conducted on April 1, 2022!
On our company website, we introduce numerous case studies of underground obstacle removal. On this page, we present the sizes for low-headroom construction using the multi-drill method (equivalent to BG method) in drawings. Our company selects tools according to the situation and carries out the construction. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-drill method (equivalent to BG method) ■ All-casing method (equivalent to BG method) *For more details, please download the PDF from the related link or contact us.
- Company:東京テクノ
- Price:Other